Remodels
Remodel Wiring in Brier
One window with the walls open, and then it shuts for twenty years.
Wiring for the room you are actually building
Miss the open-wall window and you are either cutting drywall later or living with a layout decided by where the 1974 cable happened to run. Twenty minutes with the drawings before demolition settles the circuit count, whether the existing feed carries it, where the lighting switches from, and which decisions get expensive once the rock is up. In houses of this vintage the honest answer is often that the panel needs attention first — far better known now than in week three.
What is included
A planning session on the drawings
Circuits, capacity, switching and device positions settled before demolition.
Rough-in while walls are open
Boxes set and cable run to suit the cabinetry and fixtures you actually chose.
Working to the site schedule
We fit around the plumber and the drywall crew so the rough inspection clears on time.
Trim-out and testing
Devices, plates and fixtures at the end, tested, panel relabelled to match.
The right moment to call
Drawings are nearly final
The cheapest moment to change anything electrical.
The kitchen is moving
Appliance positions drive the circuit layout completely.
A basement is being finished
Finished rooms need more than the circuits down there were ever meant to carry.
Your builder wants dates
We give real ones and keep them, which is usually why they ask.
How the work runs
Read the drawings
Early electrical decisions flagged while changing them is still free.
Quote the scope
A written figure against a defined circuit list.
Rough-in
Run while walls are open, inspected before anything is covered.
Trim-out
Devices and fixtures at the end, tested and labelled.
Questions about this work
How far ahead should we book?
As soon as drawings are close. Earlier means the dates work around your build rather than ours.
Will the panel cope with a bigger kitchen?
In a house of this era, frequently not without attention. We check at planning stage so it is a decision rather than a surprise.
Can you work around our other trades?
That is most of the job. Rough-in is timed so the inspection clears before drywall arrives.
Get the electrical planned early
Bring the drawings. The conversation and the figure are both free.